Login






I've forgotten my password
Cygnet
Cygnet Rowing Club
on the Tideway since 1890
CSSC Sports and Leisure
Posts per page: 3 | 6 | 9 | All
  • Navigation buoy positioning

    Author: Neil Pickford | Date: 5th June 2020

    I hope members of your clubs are managing to get out on the water and enjoying sculling and where possible, some crew rowing.

    Some of your club members might be commenting on the position of buoys at low tide (I clipped one myself this week). The PLA have checked the position of all the buoys at high tide and they are all in the correct place. The lower than normal levels at the bottom of the tide is possibly making it difficult to navigate them. If you do come across any of the buoys in the wrong place please let the PLA or myself know

    All the best

    Tony Reynolds
    TRRC Safety Advisor

    email: safety[at]thames-rrc.org

    Permanent link | Comments (0)

  • Hamhaugh Island Fire Safety Training

    Author: Neil Pickford | Date: 28th September 2019

    Hi all,

    I hope everyone had a good summer,

    As part of our ongoing work with Surrey Fire & Rescue, they have offered to come to the Island and give us a bit of training with pumps etc - so we can get a better grasp of how to use pumps and hoses in the unfortunate event of a fire.

    The date has been set for Saturday 28th September, time and location TBC, but most likely late morning It will be conducted at a relaxed, instructional pace, and Iím sure will be both informative and practical Everyone is welcome - and I would encourage at least one member of each household to attend if at all possible.

    Any questions please drop me a line Best wishes


    Mike Sedgwick
    Director at By This River
    Email mike@bythisriver.co.uk Website www.bythisriver.co.uk

    Permanent link | Comments (0)

  • Fulham Football Ground Works (Updated)

    Author: Neil Pickford | Date: 22nd July 2019

    See NtMs U13 and U17 issued by the PLA, regarding works to the riverside stand at Fulham FC.

    See here for a presentation regarding the works. Once work commences there will be two warning buoys to alert river users to the works. The buoys should be installed by 24th June with work scheduled to start after 8th July. 

    A jack-up barge was put in place on Monday 22nd July

    Follow @FulhamFCWorks for up-to-date information.

    Antony Reynolds

    Rowing Safety Adviser | Thames Regional Rowing Council

    jackup1jackup2

    Permanent link | Comments (0)

Page 1 of 21

CYGNET ROWING CLUB


The Civil Service Boathouse,
Riverside Drive,
Dukes Meadows,
Chiswick
W4 2SH


2020 Tidal predictions (pdf)